Project news

Notes from the field

Plain guides for superintendents, project managers and estimators on getting layout and as-builts right the first time.

Survey target held against a pipe support under scaffolding for an as-built measurement

As-Built Surveys · November 29, 2026

As-Built Surveys Explained: What They Are and When Your Project Needs One

What an as-built survey is, when to schedule one, what the report contains and how it differs from layout. A practical guide for Alberta construction projects.

Read the article
GNSS receiver and field controller overlooking a stripped and graded development site

Planning a Survey · November 26, 2026

What Construction Surveying Costs in Alberta and How It Is Priced

How construction surveying is priced in Alberta: crew rates, lump sums and unit rates, what drives the cost, and how to avoid paying for return trips.

Read more
Close view of a total station in winter with snow-covered hills behind

Field Practice · November 21, 2026

Winter Construction Surveying in Alberta: What Changes When the Ground Freezes

Frost heave, benchmark checks, cold batteries, marking in snow, short daylight and northern highway travel: how construction surveying changes in winter.

Read more
Footing and foundation layout painted across rebar mats for a retaining wall

As-Built Surveys · November 17, 2026

Anchor Bolt As-Built Surveys: Why They Happen Before the Steel Arrives

Why anchor bolts are surveyed before the pour and again after it, what the as-built report contains, the usual problems it finds, and who should receive it.

Read more
Flagged grade stake on a stripped subgrade with a truck in the distance

Field Practice · November 12, 2026

How to Read Construction Survey Stakes

How to read construction survey stakes: offsets, cut and fill, stations, hubs, lath and guard stakes, with a table of common markings and what each one means.

Read more
Total station display showing stakeout values beside a concrete foundation under construction

Planning a Survey · November 7, 2026

What to Send Your Surveyor Before the First Layout Visit

A checklist of drawings, CAD files, control, schedules and site details to send your construction surveyor before the first layout visit, and why each matters.

Read more
Pile locations painted in two colours across an excavation floor for a retaining wall foundation

Pile Surveys · November 9, 2024

Pile Layout and As-Built Surveys for Oil Sands Projects

How pile layout and pile as-built surveys work on oil sands and energy projects in northern Alberta, by pile type, with what to send before the rig arrives.

Read more
GNSS receiver set up in front of a refinery in the Edmonton area

Regions · October 12, 2024

Construction Surveying in Fort McMurray and Grande Prairie

Pile staking, gridlines, footings, benchmarks, site layout, volume surveys and mine site stakeout for projects in the Fort McMurray and Grande Prairie regions.

Read more
Total station set up for layout beside formwork on a building site in early winter

Regions · September 14, 2024

Construction Surveying Across Northern Alberta: What We Do and Where We Work

An overview of Alberta Construction Surveying: layout, as-built, control and volume surveys from Edmonton to Fort McMurray, Grande Prairie and High Level.

Read more
Survey drone landed beside a flagged stake at the edge of a field

Field Practice · September 6, 2024

Drone and LiDAR Surveys on Construction Sites: Where They Fit

Where drone photogrammetry and LiDAR earn their place on a construction site, and where a total station or RTK GNSS is still the right tool for the work.

Read more