
Central Alberta and the Highway 2 corridor · About 1.5 hours south of Edmonton
Construction surveying in Red Deer
Construction surveying in Red Deer and central Alberta: building layout, anchor bolts, gridlines, utility line and grade, as-built surveys and yard volumes.
Construction surveyors for Red Deer projects
Red Deer sits halfway along the Highway 2 corridor, and its construction reflects that: highway commercial and warehousing around Gasoline Alley, oilfield service shops and fabrication yards in the industrial parks, and schools, health and municipal buildings for a city that serves most of central Alberta. Petrochemical plants at Joffre and near Prentiss, east of the city, add industrial work.
At about an hour and a half from Edmonton, Red Deer is a day trip for us. A crew can leave in the morning, do a full day of layout or as-builts and be back the same night, so there is no accommodation to carry on short scopes. Drawings are reviewed and coordinates checked in the office before each visit.
Also serving: Blackfalds, Lacombe, Penhold, Innisfail, Sylvan Lake, Springbrook, Joffre.
Local work
What we survey around Red Deer
- 01
Highway commercial and retail
Building layout, footings, anchor bolts and site grading for retail, hotels and fuel stations, with curb, parking lot and stormwater layout to the civil drawings.
- 02
Shops and fabrication yards
Pile or footing layout, column lines and slab edges for pre-engineered steel buildings, and grading stakes and as-builts for large gravel yards.
- 03
Petrochemical plant work
Layout and as-built surveys for foundations, pipe racks and equipment inside operating plants east of Red Deer, working in the plant grid and under site permits.
- 04
Municipal and institutional projects
Control, gridlines and elevations for schools, recreation and health buildings, plus line and grade for the utilities and roads that serve them.
Services
Most requested in Red Deer
All ten services are available here. These are the ones crews are booked for most often in this region.

Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Read more
Gridline, Anchor Bolt and Column Layout
Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.
Read more
Underground Utility and Site Servicing Layout
Line and grade for water, sanitary, storm and shallow utilities, with inverts checked and everything surveyed before the trench is closed.
Read more
Earthworks, Grading and Volume Surveys
Original ground surveys, slope and grade stakes, cut and fill maps and measured volumes for progress claims and balancing a site.
Read moreSurveying in Red Deer: common questions
Is Red Deer close enough for a same-day visit?
Yes. It is about 150 kilometres down Highway 2, so the crew drives down in the morning and returns that evening. Travel is charged, but there is no overnight cost on a one-day scope. With a day or two of notice we can usually fit a visit in.
Can you work inside the petrochemical plants east of Red Deer?
We can work on operating plant sites. Our safety program documents and insurance certificates are available for prequalification, and crews complete the orientation each site requires. Allow time for that before the first day of layout, since access approvals usually take longer than the survey preparation.
What do you need before staking a building in Red Deer?
The issued-for-construction drawings, in CAD if possible, the plot plan showing the property lines, and any control already on site. We calculate the layout from those, check it in the office, and raise any conflicts between drawings before the crew travels.
Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for a Red Deer project
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.