Construction surveying service
Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Construction layout surveys in Alberta
Construction layout is the step where the drawings become marks on the ground. Every trade that follows builds from those marks, so a mistake at layout is paid for many times over in concrete, steel and schedule.
We calculate the layout from your issued-for-construction drawings, check it against the design in the office, then stake it with robotic total stations and RTK GNSS. Stakes, nails and paint are labelled so a foreman can read them without a phone call, and each visit ends with a field sketch showing what was set and to what offset.
Scope
What we lay out
- 01
Excavation and bulk dig
Limits of excavation, top and toe of slope, and cut stakes to design subgrade.
- 02
Footings and foundations
Strip and pad footings, pile caps, grade beams and foundation walls on offset lines the formwork crew can pull from.
- 03
Gridlines and building corners
Primary gridlines on batter boards, nails or scribe marks, with offsets suited to the trade using them.
- 04
Slabs, walls and columns
Slab edges, wall lines, column centres, embeds, sleeves and blockouts on each level as the structure rises.
- 05
Elevations
Benchmarks carried into the building, finished floor elevations, and grade marks at the height each trade asks for.
- 06
Site works
Parking lots, curbs, sidewalks, light standards, catch basins and landscaping features.

Deliverables
What you get back
- Labelled stakes, nails or paint marks at agreed offsets
- Field sketch or marked-up drawing of everything set on each visit
- Coordinate list of layout points in the project system
- Check shots on control recorded for every setup
Construction layout: common questions
What offsets do you stake to?
Whatever suits the crew doing the work. Common choices are 1 m or 2 m offsets for footings and foundation walls, and 3 m or 5 m for excavation so stakes survive the dig. The offset and what it refers to is written on every stake.
Can you work from PDF drawings only?
Yes, although CAD files are faster and reduce the chance of a transcription error. When we work from PDFs we rebuild the geometry from the dimensions on the drawings and flag any dimension strings that do not close.
What happens if the drawings do not agree with each other?
We tell you before anything is staked. Conflicts between architectural, structural and civil drawings are common, and it is far cheaper to resolve them with an RFI than to find them in the formwork.
Related services
Often booked with this

Gridline, Anchor Bolt and Column Layout
Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.
Read more
Construction Control Surveys and Benchmarks
Horizontal and vertical control placed where your site needs it, tied to the design coordinate system and documented for everyone who builds from it.
Read more
As-Built Surveys
What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.
Read moreAvailable across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for construction layout
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.