
Lakeland and the Cold Lake oil sands · About 3 hours northeast of Edmonton
Construction surveying in Cold Lake
Construction surveying in Cold Lake and Bonnyville: pile layout for well pads and pipe supports, plant foundations, control extension, as-builts and pad volumes.
Construction surveyors for Cold Lake projects
Most heavy construction around Cold Lake and Bonnyville is in-situ heavy oil. Steam-assisted gravity drainage and cyclic steam projects are built as a central plant with steam generators, water treatment and tanks, surrounded by well pads linked by above-ground pipelines on pile supports. Pads and pipeline corridors are added year after year as the field expands.
The air force base at Cold Lake brings a different kind of work, with hangars, aprons and institutional buildings, and the city and Bonnyville add commercial and municipal projects. We drive out from Edmonton, about three hours, and stay in the area for multi-day scopes. Safety program documents and insurance certificates are provided for prequalification ahead of the trip.
Also serving: Bonnyville, Ardmore, Cherry Grove, La Corey, Glendon, Elk Point, St. Paul.
Local work
What we survey around Cold Lake
- 01
Well pads
Grade stakes for pad construction, pile layout for wellhead modules and pipe supports, and as-built surveys of piles and finished pad elevations.
- 02
Central processing facilities
Pile, foundation and anchor bolt layout for steam generators, vessels, tanks and pipe racks, with as-builts reported in the plant grid.
- 03
Above-ground pipeline corridors
Pile support locations and top-of-pile elevations staked along steam and emulsion line routes, then surveyed after installation so supports can be set to grade.
- 04
Buildings and aprons
Gridline, footing and slab layout for hangars, shops and commercial buildings, and grade control for concrete aprons and paved areas.
Services
Most requested in Cold Lake
All ten services are available here. These are the ones crews are booked for most often in this region.

Pile Layout and Pile As-Built Surveys
Driven, screw, helical and bored piles staked ahead of the rig, then surveyed after installation with deviation and cut-off reports.
Read more
Industrial Plant and Oil Sands Construction Surveys
Pile fields, equipment foundations, pipe racks, module settings and as-builts on plant sites from the Industrial Heartland to Fort McMurray.
Read more
Construction Control Surveys and Benchmarks
Horizontal and vertical control placed where your site needs it, tied to the design coordinate system and documented for everyone who builds from it.
Read more
As-Built Surveys
What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.
Read moreSurveying in Cold Lake: common questions
How long does it take to get a crew to Cold Lake?
The drive from Edmonton is about three hours, so a crew can be on site by mid-morning on the first day. For anything longer than a day we stay in Cold Lake or Bonnyville. Booking a few days ahead leaves time for orientations and for checking the layout files.
Do you extend control out to new pads?
Yes. New pads are often well away from the central plant control. We bring coordinates and elevations out with RTK GNSS and levelling, set monuments clear of construction, and check back to plant control so the pad, the pipeline and the plant all agree.
Is muskeg a problem for layout?
It affects timing more than method. Pads and corridors in wet ground are usually built in winter, and stakes in peat do not hold position well once it thaws. We put control on piles or mineral soil where possible and recheck marks after breakup.
Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for a Cold Lake project
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.