
Calgary region · About 3 hours south of Edmonton
Construction surveying in Calgary
Construction surveying in Calgary: tower gridlines, warehouse and pile layout, control in 3TM, servicing line and grade, as-built surveys and earthwork volumes.
Construction surveyors for Calgary projects
Calgary builds tall downtown and wide on its edges. Concrete towers and mixed-use projects in the core need tight gridline and elevation control carried up many levels, while the distribution centres around Balzac and the southeast industrial areas cover large footprints where slab edges, dock lines and yard grades matter most. New communities keep pushing servicing and road work outward.
We travel to Calgary from Edmonton, about three hours down Highway 2, and schedule the work in blocks so the travel is used well. Longer scopes such as a pile program, a tower core or a servicing contract are handled with a crew staying in the city for the duration. Calculations and checks are done in the office before each trip.
Also serving: Airdrie, Cochrane, Okotoks, Chestermere, Balzac, Strathmore, High River.
Local work
What we survey around Calgary
- 01
High-rise and mixed-use towers
Primary control transferred up the structure, core walls, columns and slab edges set on each level, and verticality checks on the core as the building climbs.
- 02
Warehouses and logistics centres
Pile or footing layout, column grids, dock doors and slab edges for large distribution buildings, with as-built surveys of slabs, yards and stormwater ponds.
- 03
New community servicing
Line and grade for deep and shallow utilities, curb, gutter and road structure in new communities, working from the engineer's design files.
- 04
Commercial and retail sites
Building corners, footings, anchor bolts, parking lot grades, light standards and catch basins, followed by as-built surveys the engineer can use for lot grading review.
Services
Most requested in Calgary
All ten services are available here. These are the ones crews are booked for most often in this region.

Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Read more
Gridline, Anchor Bolt and Column Layout
Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.
Read more
Road, Curb and Subdivision Layout
Centreline, subgrade, curb and gutter, sidewalks and lot grading staked through each stage of a road or subdivision build.
Read more
Construction Control Surveys and Benchmarks
Horizontal and vertical control placed where your site needs it, tied to the design coordinate system and documented for everyone who builds from it.
Read moreSurveying in Calgary: common questions
Is travel from Edmonton charged on Calgary work?
Yes, and the quote shows it as its own line. On jobs with several days of work we book consecutive days and keep the crew in Calgary, which spreads the travel over more production. Single short visits are the least economical way to use us there.
Can you work in Calgary's 3TM coordinates and city control?
Yes. Calgary civil drawings are normally in 3TM on NAD83 with a 114 degree central meridian, referenced to Alberta Survey Control Markers. We check the control on site against at least two other markers before any layout, and report anything that does not agree with the published values.
How do chinooks affect layout and control?
Freeze and thaw cycles move stakes, hubs and shallow benchmarks more than steady cold does. After a chinook we recheck control before staking from it, and we prefer control on piles, foundations or other deep, stable structures once they exist. Soft ground can also limit where stakes will hold.
Other centres: Edmonton, Sherwood Park, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for a Calgary project
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.