
Peace Country and the Montney · About 4.5 hours northwest of Edmonton
Construction surveying in Grande Prairie
Construction surveying in Grande Prairie: pile and foundation layout for gas plants and compressor stations, building gridlines, pad grading, as-builts and volumes.
Construction surveyors for Grande Prairie projects
Grande Prairie is the service centre for the Montney gas play, and that drives a steady run of gas plants, compressor stations, well pads and pipeline tie-ins south and west of the city, along with the shops and yards in Clairmont that support them. The city itself keeps adding commercial sites, schools and new neighbourhoods as the region grows.
Facility sites out here are often an hour or more past the pavement, on lease roads that change with the weather. We drive up Highway 43 from Edmonton and base the crew in Grande Prairie for the duration of a scope. Layout files are prepared and checked before we leave, so the crew is productive from the first morning on site.
Also serving: Clairmont, Sexsmith, Beaverlodge, Wembley, Hythe, Grovedale, Valleyview.
Local work
What we survey around Grande Prairie
- 01
Gas plants and compressor stations
Pile layout and as-builts, foundation and anchor bolt layout for compressors, coolers and vessels, and as-built surveys of skids, pipe supports and buried lines.
- 02
Well pads and lease sites
Topographic surveys of the cleared lease, grade stakes for the pad, access road and berms inside the surveyed lease boundary, and as-built surveys with cut and fill volumes.
- 03
Commercial and institutional buildings
Building corners, footings, gridlines and elevations for retail, schools and service shops in the city and Clairmont, with site grading and parking lot layout.
- 04
Roads and site servicing
Line and grade for water, sanitary and storm mains, curb and gutter and road structure on servicing contracts in new residential and industrial areas.
Services
Most requested in Grande Prairie
All ten services are available here. These are the ones crews are booked for most often in this region.

Industrial Plant and Oil Sands Construction Surveys
Pile fields, equipment foundations, pipe racks, module settings and as-builts on plant sites from the Industrial Heartland to Fort McMurray.
Read more
Pile Layout and Pile As-Built Surveys
Driven, screw, helical and bored piles staked ahead of the rig, then surveyed after installation with deviation and cut-off reports.
Read more
Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Read more
Pre-Construction Topographic Surveys
Existing conditions surveyed before design or construction: ground, structures, visible utilities and drainage, drawn with clean labelled contours.
Read moreSurveying in Grande Prairie: common questions
Do you travel to gas plant and compressor sites outside Grande Prairie?
Yes. We work across the region, including sites south of the Wapiti River and west toward the British Columbia border. Send the site location and access directions with your request. Radio-controlled roads, travel time from town and orientation requirements all affect how the days are planned.
What is the smallest scope worth mobilizing for?
There is no fixed minimum, but a four and a half hour drive each way means a one-hour task still carries travel. It usually makes sense to group layout, as-builts and any volume surveys into one trip. We will tell you plainly if the scope looks too small.
How does spring breakup affect survey work in the Peace Country?
Road bans and soft lease roads can stop heavy equipment for weeks, but a survey truck can often still get in. Breakup is a good time for topographic surveys, as-builts and control checks. Stakes set in thawing ground are checked again before they are used.
Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for a Grande Prairie project
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.