
Edmonton metropolitan region · About 20 minutes from our Sherwood Park base
Construction surveying in Edmonton
Construction surveying in Edmonton: building layout, pile and gridline staking, control, as-built surveys and volumes. Next-day crews are often available.
Construction surveyors for Edmonton projects
Edmonton is next door to our Sherwood Park base. Most weeks we are on commercial and institutional building sites, multi-family projects, warehouse and industrial bays in the northwest and southeast, and site servicing jobs in new neighbourhoods on the edge of the city. The work runs from the first control point and excavation stake through gridlines on each level to the final as-built.
Because crews start their day here, short-notice calls are practical. Next-day service is often available in the Edmonton region, and a two-hour visit to reset a lost gridline or check a set of anchor bolts is a normal request. Every layout is calculated and checked in the office before the crew leaves, then checked again on site from independent control.
Also serving: St. Albert, Sherwood Park, Spruce Grove, Stony Plain, Beaumont, Acheson, Devon, Morinville.
Local work
What we survey around Edmonton
- 01
Commercial and institutional buildings
Excavation limits, footings, gridlines and elevations carried up floor by floor, with anchor bolt and embed checks before each pour and as-builts as the structure rises.
- 02
Multi-family and mixed-use
Parkade excavation and shoring lines, core and column layout on each slab, and elevation control so the wood-frame or concrete levels above start from a square base.
- 03
Warehouses and industrial bays
Pile and footing layout, slab edges, dock and column lines for large-footprint buildings, plus yard grading stakes and as-builts of finished gravel or pavement surfaces.
- 04
Site servicing and roads
Line and grade for storm, sanitary and water mains, catch basins, curb and gutter and road structure on servicing contracts in new neighbourhoods and industrial parks.
Services
Most requested in Edmonton
All ten services are available here. These are the ones crews are booked for most often in this region.

Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Read more
Gridline, Anchor Bolt and Column Layout
Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.
Read more
As-Built Surveys
What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.
Read more
Underground Utility and Site Servicing Layout
Line and grade for water, sanitary, storm and shallow utilities, with inverts checked and everything surveyed before the trench is closed.
Read moreSurveying in Edmonton: common questions
How quickly can a crew get to a site in Edmonton?
Often the next day, and sometimes the same day for a short visit. Crews start from Sherwood Park, on the east side of the city, so there is no travel day to plan around. Call with the address, the scope and the drawings you are working from, and we will tell you what is possible.
Which coordinate system do you use on Edmonton projects?
Most civil and servicing drawings in Edmonton are in 3TM coordinates on NAD83, with a central meridian of 114 degrees west, tied to Alberta Survey Control Markers. Building projects often use a site grid. We work in whichever system the drawings use and record how it ties to control.
Can you take on a short job, such as one day of layout?
Yes. A lot of Edmonton work is a single visit: a set of footings, a pile group, an anchor bolt check before a pour. Short jobs are priced at a crew rate, and next-day service is often available.
Other centres: Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for a Edmonton project
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.