Skip to content
Alberta ConstructionSurveying
GNSS receiver set up in front of a refinery in the Edmonton area

Border city and heavy oil country · About 2.5 hours east of Edmonton

Construction surveying in Lloydminster

Construction surveying in Lloydminster: pile and foundation layout for heavy oil facilities, tank farm grading, building gridlines, as-builts and volumes.

Construction surveyors for Lloydminster projects

Lloydminster sits on the Alberta and Saskatchewan border and has been a heavy oil town for generations. Construction here follows that industry: upgrading and refining facilities, asphalt and storage terminals, thermal heavy oil plants in the surrounding country, and the tank batteries, truck terminals and service shops that keep the field running. Highway 16 brings a steady share of commercial building as well.

We reach Lloydminster in about two and a half hours on Highway 16, close enough for a long day trip and easy to stay over for larger scopes. The city straddles the fourth meridian, and drawings can arrive in different coordinate systems depending on who designed the work, so we confirm the system, datum and control for each job before the crew leaves Edmonton.

Also serving: Kitscoty, Marwayne, Vermilion, Blackfoot, Dewberry, Paradise Valley.

Local work

What we survey around Lloydminster

  • 01

    Upgrading and refining facilities

    Pile, foundation and anchor bolt layout for process units, pipe racks and tanks, and as-built surveys of existing structures ahead of tie-ins and additions.

  • 02

    Tank farms and terminals

    Tank foundation rings, containment berms, loading racks and piping supports laid out to design, with volume checks on berm capacity and as-builts of finished grades.

  • 03

    Thermal heavy oil plants

    Pad grading, pile layout and equipment foundations for steam plants and well pads in the surrounding area, with pile as-builts and cut-off elevations.

  • 04

    Commercial and service buildings

    Footings, gridlines and anchor bolts for shops, truck terminals and retail along the highway corridors, plus yard grading and parking lot layout.

Services

Most requested in Lloydminster

All ten services are available here. These are the ones crews are booked for most often in this region.

All services

Surveying in Lloydminster: common questions

Do you work on the Saskatchewan side of Lloydminster?

Our work is centred in Alberta. For a construction layout scope on the Saskatchewan side of the city, call and we will talk through the site and its requirements before quoting.

Is Lloydminster a day trip or an overnight stay?

Either. A single day of layout works as a day trip, with about five hours of driving in total. For two or more days of work the crew stays in Lloydminster, which gives full days on site and usually costs less than repeated travel.

Which coordinate system applies near the border?

Lloydminster is at 110 degrees west, inside UTM zone 12, and most industrial sites use a plant or project grid of their own. We read the coordinate system and datum from the drawings, check them against site control, and ask the designer when they are not stated.

Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for a Lloydminster project

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote