Skip to content
Alberta ConstructionSurveying
GNSS receiver set up in front of a refinery in the Edmonton area

Construction surveying service

Industrial Plant and Oil Sands Construction Surveys

Pile fields, equipment foundations, pipe racks, module settings and as-builts on plant sites from the Industrial Heartland to Fort McMurray.

Industrial and oil sands surveys in Alberta

Industrial work is less forgiving than most construction. Modules and pipe spools are fabricated off site to tight dimensions, and they have to fit foundations and tie-in points that were surveyed months earlier, often by a different contractor.

We work to the plant coordinate system and datum, hold tight control across the site, and report as-builts in the form the engineering group needs for fit-up. Crews are used to site orientations, permits and working inside an operating facility, and they show up with the paperwork done.

Scope

Industrial survey scope

  • 01

    Pile fields

    Layout and as-built of large pile groups for pipe racks, modules and equipment.

  • 02

    Equipment foundations

    Anchor bolts, embeds and base plate elevations for vessels, pumps, compressors and skids.

  • 03

    Pipe racks and supports

    Rack columns, pipe support locations and top-of-steel elevations.

  • 04

    Module setting

    Foundation as-builts ahead of delivery and position checks as modules are set.

  • 05

    Tie-in points

    As-built location and elevation of flanges, nozzles and existing structures for design and fabrication.

  • 06

    Lease and pad construction

    Pad layout, grading, containment berms, access roads and volumes.

Total station set up in deep snow beside steel pipe racks at an industrial facility
Total station set up in deep snow beside steel pipe racks at an industrial facility

Deliverables

What you get back

  • Layout in plant coordinates with documented control checks
  • As-built reports with deviations for piles, bolts and steel
  • Tie-in point coordinates and elevations
  • Civil 3D and CSV files to your document control standard
Get a quote for industrial and oil sands

Industrial and oil sands: common questions

Can you meet site prequalification requirements?

We carry professional liability insurance and maintain a complete safety program. Send us the prequalification package for your site and we will return the documentation.

Do you work on shutdowns and tight schedules?

Yes. Tell us the window and the scope and we will plan crew days around it. Layout calculations are prepared ahead so time on site is spent measuring, not at a laptop.

Which regions do you cover?

All of Alberta. Regular work areas include the Industrial Heartland northeast of Edmonton, Fort McMurray and the Athabasca oil sands, Cold Lake, Conklin, Peace River and Grande Prairie.

Related services

Often booked with this

Available across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for industrial and oil sands

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote