Original ground surveys, slope and grade stakes, cut and fill maps and measured volumes for progress claims and balancing a site.

Earthworks and volumes surveys in Alberta

Earthworks are usually one of the largest costs on a project and the one most often disputed. Quantities are only as good as the surfaces they are calculated from.

We survey original ground before stripping, stake the cuts and fills, and measure progress as the work goes on. Volumes are calculated surface to surface, and each report states the surfaces used, the method and the date of survey so the contractor, owner and consultant are working from numbers they can all check.

Scope

Earthworks survey scope

  • 01

    Original ground

    Pre-construction surface surveyed by total station, GNSS or drone before stripping begins.

  • 02

    Grade and slope staking

    Cut and fill stakes, slope stakes, top and toe of slope and limits of grading.

  • 03

    Machine control surfaces

    Design surfaces prepared from the grading plan and exported for GNSS machine control.

  • 04

    Progress volumes

    Monthly or milestone surveys with cut, fill and net volumes for progress claims.

  • 05

    Stockpiles and borrow pits

    Stockpile, pit and waste area volumes measured and reported.

  • 06

    Final grade check

    Finished surface compared to design with a colour cut and fill map showing where grade is high or low.

Flagged grade stake on a stripped subgrade with a truck in the distance
Flagged grade stake on a stripped subgrade with a truck in the distance

Deliverables

What you get back

  • Volume report stating surfaces, method and survey date
  • Cut and fill colour map in PDF
  • Surface files in Civil 3D and LandXML
  • Contour plan with 0.5 m contours, clearly labelled
Get a quote for earthworks and volumes

Earthworks and volumes: common questions

How accurate are volume surveys?

Accuracy depends on how well the two surfaces represent the ground, so it comes down to point density and breaklines more than the instrument. We survey every change in slope and state the method in the report so the number can be checked.

Can you settle a quantity dispute?

We can provide an independent survey and volume calculation with the surfaces and method documented. That gives both sides one set of numbers to review.

Do you build machine control models?

Yes. We prepare design surfaces from the grading plan and export them for the machine control system on your equipment, and we check the model against the drawings before it is issued.

Related services

Often booked with this

Available across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for earthworks and volumes

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.