Construction surveying service
Road, Curb and Subdivision Layout
Centreline, subgrade, curb and gutter, sidewalks and lot grading staked through each stage of a road or subdivision build.
Roads and subdivisions surveys in Alberta
Subdivision and road construction moves in stages, and the surveyor is back on site for each one: clearing, stripping, deep utilities, subgrade, curb, base, pavement and lot grading. The job runs well when the stakes are there before the crew is.
We plan the staking with your superintendent so layout keeps ahead of production, and we talk with operators and foremen as we go so stakes are set and marked the way they want to use them. One crew and one set of control carries through from the first stake to the final as-built.
Scope
Road and subdivision scope
- 01
Clearing and stripping limits
Limits of disturbance and stripping staked from the approved plans.
- 02
Road centreline and subgrade
Centreline, offsets and grade stakes at regular stations and at every change in grade.
- 03
Curb and gutter
Offset hubs with cut or fill to top of curb, including curb returns, crossings and catch basin locations.
- 04
Sidewalks and paths
Line and grade for walks, trails, ramps and medians.
- 05
Lot grading
Lot corners for grading reference, building pocket and swale grades.
- 06
Ponds and drainage
Stormwater ponds, ditches, culverts and outfalls.

Deliverables
What you get back
- Stakes and hubs marked with station, offset and grade
- Cut sheets for curb, subgrade and base
- Stage as-builts for subgrade, base and finished surface
- Final as-built data in Civil 3D for record drawings
Roads and subdivisions: common questions
How often are grade stakes set?
Typically every 10 to 20 m on tangents and closer through curves, intersections and vertical changes. The interval is agreed with the grading and curb crews at the start.
Can you keep up with several crews at once?
Yes. On a busy subdivision the utility, grading and curb crews all need stakes in the same week. We plan the order with your superintendent and stake a few days ahead of each crew so none of them wait.
Can you stake from a Civil 3D corridor model?
Yes. We load the alignments, profiles and surfaces directly, which removes hand calculation and lets us stake any station and offset on request.
Related services
Often booked with this

Underground Utility and Site Servicing Layout
Line and grade for water, sanitary, storm and shallow utilities, with inverts checked and everything surveyed before the trench is closed.
Read more
Earthworks, Grading and Volume Surveys
Original ground surveys, slope and grade stakes, cut and fill maps and measured volumes for progress claims and balancing a site.
Read more
As-Built Surveys
What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.
Read moreAvailable across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for roads and subdivisions
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.