Skip to content
Alberta ConstructionSurveying
Pile locations painted in two colours across an excavation floor for a retaining wall foundation

Construction surveying service

Pile Layout and Pile As-Built Surveys

Driven, screw, helical and bored piles staked ahead of the rig, then surveyed after installation with deviation and cut-off reports.

Pile layout surveys in Alberta

Piles carry the whole structure, and most specifications allow very little movement from the design location. A pile that lands out of tolerance means an engineering review, a redesigned pile cap or a replacement pile, and all three stop the job.

We stake pile centres ahead of the rig so the crew is never waiting, keep reference points clear of the working platform, and survey each pile once it is installed. The as-built report lists design and actual position, the deviation in each direction and the top-of-pile elevation, so the engineer can sign off and cut-off can proceed.

Scope

Pile survey scope

  • 01

    Pile centre layout

    Each pile marked with a pin, lath or paint and numbered to match the pile schedule.

  • 02

    Reference and offset points

    Offsets set outside the rig's working area so a pile can be re-established quickly if a mark is lost.

  • 03

    Pile types

    Driven steel and precast piles, screw and helical piles, CFA and bored piles, sheet piles and micro piles.

  • 04

    Cut-off elevations

    Cut-off marked on each pile from site benchmarks, with elevations recorded.

  • 05

    Pile as-builts

    Position and elevation of every installed pile compared against design, with out-of-tolerance piles flagged.

  • 06

    Pile caps and grade beams

    Follow-on layout for caps, grade beams and anchor bolts from the same control.

Close view of painted circles marking individual pile locations on an excavation floor
Close view of painted circles marking individual pile locations on an excavation floor

Deliverables

What you get back

  • Numbered pile layout matching the pile schedule
  • Pile as-built table: design and as-built northing, easting and elevation with deviations
  • Plan showing as-built pile locations against design
  • CSV and Civil 3D files in the project coordinate system
Get a quote for pile layout

Pile layout: common questions

How far ahead of the rig do you need to be?

A day ahead is comfortable. On large pile fields we stake in blocks that match the rig's sequence so marks are fresh and are not driven over by equipment before they are used.

What tolerance do you survey pile as-builts to?

As-builts are measured with a total station from project control, which is accurate to a few millimetres over normal site distances. The allowable pile deviation itself comes from your specification, and the report shows each pile against it.

Can you survey piles in winter?

Yes. Much of Alberta's piling is done on frozen ground. We mark with lath and paint that stays visible in snow and keep control points protected and checked through freeze and thaw.

Related services

Often booked with this

Available across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for pile layout

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote