Construction surveying service
Pile Layout and Pile As-Built Surveys
Driven, screw, helical and bored piles staked ahead of the rig, then surveyed after installation with deviation and cut-off reports.
Pile layout surveys in Alberta
Piles carry the whole structure, and most specifications allow very little movement from the design location. A pile that lands out of tolerance means an engineering review, a redesigned pile cap or a replacement pile, and all three stop the job.
We stake pile centres ahead of the rig so the crew is never waiting, keep reference points clear of the working platform, and survey each pile once it is installed. The as-built report lists design and actual position, the deviation in each direction and the top-of-pile elevation, so the engineer can sign off and cut-off can proceed.
Scope
Pile survey scope
- 01
Pile centre layout
Each pile marked with a pin, lath or paint and numbered to match the pile schedule.
- 02
Reference and offset points
Offsets set outside the rig's working area so a pile can be re-established quickly if a mark is lost.
- 03
Pile types
Driven steel and precast piles, screw and helical piles, CFA and bored piles, sheet piles and micro piles.
- 04
Cut-off elevations
Cut-off marked on each pile from site benchmarks, with elevations recorded.
- 05
Pile as-builts
Position and elevation of every installed pile compared against design, with out-of-tolerance piles flagged.
- 06
Pile caps and grade beams
Follow-on layout for caps, grade beams and anchor bolts from the same control.

Deliverables
What you get back
- Numbered pile layout matching the pile schedule
- Pile as-built table: design and as-built northing, easting and elevation with deviations
- Plan showing as-built pile locations against design
- CSV and Civil 3D files in the project coordinate system
Pile layout: common questions
How far ahead of the rig do you need to be?
A day ahead is comfortable. On large pile fields we stake in blocks that match the rig's sequence so marks are fresh and are not driven over by equipment before they are used.
What tolerance do you survey pile as-builts to?
As-builts are measured with a total station from project control, which is accurate to a few millimetres over normal site distances. The allowable pile deviation itself comes from your specification, and the report shows each pile against it.
Can you survey piles in winter?
Yes. Much of Alberta's piling is done on frozen ground. We mark with lath and paint that stays visible in snow and keep control points protected and checked through freeze and thaw.
Related services
Often booked with this

Gridline, Anchor Bolt and Column Layout
Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.
Read more
Industrial Plant and Oil Sands Construction Surveys
Pile fields, equipment foundations, pipe racks, module settings and as-builts on plant sites from the Industrial Heartland to Fort McMurray.
Read more
As-Built Surveys
What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.
Read moreAvailable across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for pile layout
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.