Skip to content
Alberta ConstructionSurveying
Total station on a tripod with its case on a snow-covered site among spruce trees

Mackenzie County and far northwestern Alberta · About 8 hours north of Edmonton

Construction surveying in High Level

Construction surveying in High Level: building and pile layout, control for remote sites, topographic surveys, as-builts and volumes, planned around winter access.

Construction surveyors for High Level projects

High Level is the service centre for the far northwest of the province, almost 800 kilometres from Edmonton by road. Forestry is the main industry, with a large sawmill and a panel plant, and oil and gas facilities extend west toward Rainbow Lake and Zama City. Farming around La Crete and Fort Vermilion adds grain handling and commercial buildings.

Distance sets the rules up here. Many sites beyond the highways are reached only by winter road or ice crossing, so construction is packed into the cold months and there is little room for a return visit. We plan the whole scope before leaving Edmonton, bring spare batteries and backup equipment, and stay in the area until the work is finished.

Also serving: Rainbow Lake, Fort Vermilion, La Crete, Zama City, Meander River, Paddle Prairie.

Local work

What we survey around High Level

  • 01

    Mill and plant projects

    Foundation, anchor bolt and equipment layout for upgrades at forestry mills, with as-built surveys of existing structures so new steel fits what is in place.

  • 02

    Oil and gas facilities

    Pile layout and as-builts, pad grading and equipment foundations at batteries, compressor stations and plants west of town, often on sites with winter access only.

  • 03

    Community and commercial buildings

    Control, footings, gridlines and elevations for schools, health facilities, shops and grain handling sites in High Level, La Crete and Fort Vermilion.

  • 04

    Roads and winter access

    Grade stakes and culvert layout on road upgrades, topographic surveys for crossings and borrow sources, and volume surveys of gravel stockpiles.

Services

Most requested in High Level

All ten services are available here. These are the ones crews are booked for most often in this region.

All services

Surveying in High Level: common questions

How do you plan a trip as far as High Level?

The drive is about eight hours, so the crew takes a travel day each way and stays for the full scope. We ask for the complete drawing set and schedule up front, calculate and check everything in the office, and bring files for work that might be added on site.

Can you reach sites on winter roads?

Yes, while the road is open. We need the road status, travel rules and any convoy or radio requirements from you or the road operator. Work on winter-access sites is scheduled with margin, because an early thaw can close the road before a second trip is possible.

What happens to survey equipment in extreme cold?

Total stations have a rated operating temperature, batteries drain quickly and data collector screens slow down. In deep cold we shorten exposure, keep batteries warm and expect lower production. If the cold stops safe work for a day, we tell you that morning so the schedule can adjust.

Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge.

Quotes

Quote for a High Level project

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote