Skip to content
Alberta ConstructionSurveying
Graded pipeline right-of-way running through cleared forest

Yellowhead corridor and the foothills · About 3 hours west of Edmonton

Construction surveying in Hinton and Edson

Construction surveying in Hinton and Edson: haul road and pad grade stakes, earthwork volumes, control in the foothills, plant foundation layout and as-builts.

Construction surveyors for Hinton and Edson projects

Hinton and Edson sit on the Yellowhead Highway where the plains give way to the foothills. Coal has been mined south of both towns for more than a century, forestry supports a pulp mill and sawmills, and gas plants and wells are spread through the surrounding country. The highway, the rail main line and major pipelines all share the same corridor toward Jasper.

Edson is about two hours from Edmonton and Hinton about three, so we treat most scopes as an overnight trip. Foothills sites bring steep ground, heavy tree cover and long resource roads, which makes good control more important. We set it carefully at the start and check it on each return visit, particularly on mine and earthworks sites where ground is being moved.

Also serving: Jasper, Grande Cache, Robb, Cadomin, Brule, Peers, Marlboro.

Local work

What we survey around Hinton and Edson

  • 01

    Mine and haul road earthworks

    Grade stakes for haul roads, ponds and pads, and progress topographic surveys with cut, fill and stockpile volumes calculated against the previous survey or the design.

  • 02

    Pipeline facilities and crossings

    Layout and as-built surveys for pump and compressor station foundations, valve sites and piping, and as-builts of road, rail and stream crossings.

  • 03

    Mill and plant projects

    Pile, foundation and anchor bolt layout for new equipment and buildings at forestry mills and gas plants, with as-builts tied to existing structures.

  • 04

    Highway and bridge work

    Line and grade for highway improvements, intersections and interchanges along the Yellowhead, plus pier, abutment and girder seat layout on stream and rail crossings.

Services

Most requested in Hinton and Edson

All ten services are available here. These are the ones crews are booked for most often in this region.

All services

Surveying in Hinton and Edson: common questions

Do you survey on active mine sites?

We do construction survey work on mine sites, such as haul road and pond layout, plant foundations and volume surveys. Tell us the mine's orientation and vehicle requirements ahead of time. Our safety program documents and insurance certificates are available for the prequalification process.

How does tree cover affect GNSS in the foothills?

Heavy timber and steep valley walls block satellite signals and degrade RTK positions. Where that happens we set control in the open with GNSS and carry it into the site by total station traverse. It takes longer, and we allow for it in the quote.

How often should volumes be surveyed on an earthworks job?

That depends on how the contract is paid. Monthly surveys matched to progress claims are common, with an original ground survey before stripping and a final survey at completion. Using the same control and the same method each time keeps the quantities consistent from one claim to the next.

Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Lethbridge, High Level.

Quotes

Quote for a Hinton and Edson project

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote