
About us
A construction survey company, and nothing else
Alberta Construction Surveying is an owner-operated firm based in Sherwood Park. We work for contractors, engineers and industrial owners across the province on a project by project basis.
Engineering layout has always been the centre of the company
Some survey firms do a little of everything. We do one thing: put designs on the ground and measure what was built. Underground stakeouts, curb and gutter, piles, gridlines, anchor bolts and columns are the daily work, and they have been for more than twenty years.
More than 200 commercial projects have been taken from the first control point to the final as-built. That history matters on site. It is why conflicts in the drawings get caught before layout, why stakes are set where they will survive the excavation, and why the report an engineer needs shows up without being chased.
The company is owner operated. The surveyor who prices your job is accountable for it in the field, and answers the phone when your superintendent calls.
- Years of construction survey experience
- 20+Years of construction survey experience
- Commercial projects taken from first stake to as-built
- 200+Commercial projects taken from first stake to as-built
- Crews available on short notice across Alberta
- Next dayCrews available on short notice across Alberta
- Every layout verified in the field and in the office
- 2 checksEvery layout verified in the field and in the office

Equipment and software
Current instruments, kept in working order
A survey is only as good as the instrument and the checks behind it. Our equipment is current, maintained and checked on control at the start of every setup.
- Robotic total stations for building, pile and anchor bolt layout
- RTK GNSS for site works, earthworks and topography
- Digital levels for benchmarks and elevation control
- AutoCAD Civil 3D and ArcGIS for calculation and drafting
- Trimble Business Center and Leica Infinity for data reduction and adjustment
How we work
Four things you can hold us to
Checked twice
All layout is checked digitally in the office and again in the field, to remove the chance of a costly error.
Provincial standards
Work is carried out in accordance with Alberta standards and your project specification.
Safety first
A complete safety program is in place for large ongoing projects, with documents available for prequalification.
Plain communication
We talk with operators and foremen as we go, so stakes are set and marked the way the crew will use them.

Book a crew
Need a crew on site?
Send the drawings and your schedule. You will have a written quote back the same day in most cases.
Quotes
Request a quote
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.