Skip to content
Alberta ConstructionSurveying
GNSS base station and flagged stakes on a freshly cleared construction site

Southern Alberta · About 5 hours south of Edmonton

Construction surveying in Lethbridge

Construction surveying in Lethbridge: solar pile layout, wind turbine foundations, food plant gridlines, irrigation line and grade, as-builts and volumes.

Construction surveyors for Lethbridge projects

Lethbridge is the centre of southern Alberta's irrigated farm country, and industrial construction in and around the city is tied to food: potato, sugar beet, canola and feed processing plants, cold storage and grain handling. The irrigation districts in the region are steadily replacing open canals with pipelines and building new reservoirs. Wind farms and large solar projects have been built across the surrounding prairie.

We travel about five hours from Edmonton for Lethbridge work, so it suits scopes of several days where the crew stays in the city. Solar and wind projects fit that pattern well, with thousands of pile locations or dozens of turbine foundations staked in sequence. Layout files are built and checked in the office before the trip so field days go to production.

Also serving: Coaldale, Coalhurst, Taber, Picture Butte, Fort Macleod, Raymond, Magrath, Cardston.

Local work

What we survey around Lethbridge

  • 01

    Food processing plants

    Pile and footing layout, gridlines, anchor bolts and equipment foundations for process buildings, with floor slope and drain elevations controlled closely for wash-down areas.

  • 02

    Solar farms

    Pile locations for racking staked by row and block from the design file, with as-built checks on pile position and top elevation as installation proceeds.

  • 03

    Wind farm foundations and roads

    Turbine foundation centres, excavation limits and anchor ring elevations, plus grade stakes for access roads, crane pads and collector line routes.

  • 04

    Irrigation canals and pipelines

    Line and grade for canal rehabilitation, buried pipelines, turnouts and reservoirs, with as-built profiles and earthwork volumes for progress payments.

Services

Most requested in Lethbridge

All ten services are available here. These are the ones crews are booked for most often in this region.

All services

Surveying in Lethbridge: common questions

Is it practical to bring a crew from Edmonton to Lethbridge?

For multi-day scopes, yes. The drive is about five hours, so the crew travels down, stays in Lethbridge and works consecutive days. For a single short visit the travel will outweigh the work, and we will say so when you call.

How does wind affect survey work in southern Alberta?

Strong wind shakes tripods and prism poles, which shows up in total station measurements. On windy days we use heavier setups, shorter sights and lower pole heights, and rely more on GNSS for work that suits it. Fine-tolerance checks such as anchor bolts are timed for calmer hours.

How do you stake thousands of solar piles efficiently?

The design file is loaded and checked in the office, then piles are staked by block with RTK GNSS in the order the installer wants. A sample is checked independently each day from separate control, and missing or disturbed marks are replaced before the rig reaches them.

Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, High Level.

Quotes

Quote for a Lethbridge project

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote