Skip to content
Alberta ConstructionSurveying
Total station display showing stakeout values beside a concrete foundation under construction

Construction surveying services

Survey services for every stage of construction

Construction surveying is all we do. Ten services that cover a project from the first control point to the final as-built, delivered by one crew working from one set of control.

Scope

Choose one service or hand us the whole survey package

Each page sets out what is included, what you get back and the questions contractors ask most.

Marked survey stakes and paint lines for curb and gridline layout beside a plate compactor

Service 01

Construction Layout and Staking

Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.

Read more
Pile locations painted in two colours across an excavation floor for a retaining wall foundation

Service 02

Pile Layout and Pile As-Built Surveys

Driven, screw, helical and bored piles staked ahead of the rig, then surveyed after installation with deviation and cut-off reports.

Read more
Footing and foundation layout painted across rebar mats for a retaining wall

Service 03

Gridline, Anchor Bolt and Column Layout

Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.

Read more
GNSS receiver over a control point surrounded by guard stakes on a gravel pad

Service 04

Construction Control Surveys and Benchmarks

Horizontal and vertical control placed where your site needs it, tied to the design coordinate system and documented for everyone who builds from it.

Read more
Survey target held against a pipe support under scaffolding for an as-built measurement

Service 05

As-Built Surveys

What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.

Read more
Excavator cutting a graded bench on an Alberta earthworks project

Service 06

Earthworks, Grading and Volume Surveys

Original ground surveys, slope and grade stakes, cut and fill maps and measured volumes for progress claims and balancing a site.

Read more
GNSS base station and flagged stakes on a freshly cleared construction site

Service 07

Pre-Construction Topographic Surveys

Existing conditions surveyed before design or construction: ground, structures, visible utilities and drainage, drawn with clean labelled contours.

Read more
Excavator working beside a surveyed trench line with a marker and stake in the foreground

Service 08

Underground Utility and Site Servicing Layout

Line and grade for water, sanitary, storm and shallow utilities, with inverts checked and everything surveyed before the trench is closed.

Read more
Total station set up on a gravel road construction site with safety fencing and pipe sections

Service 09

Road, Curb and Subdivision Layout

Centreline, subgrade, curb and gutter, sidewalks and lot grading staked through each stage of a road or subdivision build.

Read more
GNSS receiver set up in front of a refinery in the Edmonton area

Service 10

Industrial Plant and Oil Sands Construction Surveys

Pile fields, equipment foundations, pipe racks, module settings and as-builts on plant sites from the Industrial Heartland to Fort McMurray.

Read more

Book a crew

Not sure which survey you need?

Call with the drawings in front of you. A surveyor will tell you what the job needs and what it does not.

Questions about our services

What does a construction surveyor do?

A construction surveyor takes the design drawings and puts them on the ground. That means setting control, staking gridlines, piles, footings, anchor bolts, utilities, curbs and grades so each trade builds in the right place, then measuring what was built and reporting it back as an as-built survey.

How fast can you get a crew to site?

Next-day service is often available in the Edmonton region, and we mobilize across Alberta on short notice. Call with your location and schedule and we will tell you straight away what is possible.

What do you need from us to price a job?

The site location, the current drawing set (PDF and CAD if you have it), the scope you want staked or measured and your schedule. With that we can usually return a written quote the same day.

How do you make sure layout is right?

Every layout is checked twice. In the office, coordinates are calculated from the drawings and reviewed against the design before the crew leaves. In the field, stakes are checked from independent control and by measured distances between points before we hand them over. Anything that does not close is fixed on the spot.

What drawings and files do you work with?

PDF and CAD drawings, Civil 3D surfaces and alignments, LandXML files and coordinate lists. Deliverables come back as PDF sketches or reports, CSV coordinate files and AutoCAD Civil 3D drawings in the project coordinate system.

Can you work on industrial and oil sands sites?

Yes. We carry professional liability insurance and have a complete safety program in place, with documentation available for prequalification. Crews arrive with the site orientation, PPE and tickets your project requires.

How is construction surveying priced?

Short jobs are usually priced at an hourly or daily crew rate with travel. Larger scopes can be quoted as a lump sum or unit rates per pile, per gridline or per visit. Your quote states what is included so there are no surprises on the invoice.

Quotes

Request a quote

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote