Construction surveying service
Pre-Construction Topographic Surveys
Existing conditions surveyed before design or construction: ground, structures, visible utilities and drainage, drawn with clean labelled contours.
Topographic surveys surveys in Alberta
An accurate survey of existing conditions tells you where the site really stands before money is committed. It is the base for design, for earthworks quantities and for every change in conditions claim that might follow.
We survey ground, structures, surface features and visible utilities, and tie the work to the project coordinate system and datum. The drawing arrives clean and layered so a designer can start work on it, with contours at 0.5 m and spot elevations where they matter.
Scope
What a topographic survey covers
- 01
Ground surface
Spot elevations and breaklines on every change in slope, ditch, swale and bank.
- 02
Site features
Buildings, pavement edges, curbs, fences, signs, poles and trees.
- 03
Utilities
Manholes with rim and invert elevations, catch basins, valves, hydrants and marked buried lines.
- 04
Drainage
Culverts, ditches, ponds and overland flow paths.
- 05
Adjacent conditions
Road centrelines, tie-in elevations and neighbouring grades the design must match.
- 06
Larger sites
Drone photogrammetry or LiDAR combined with ground control where the area makes it worthwhile.

Deliverables
What you get back
- AutoCAD Civil 3D drawing with surface, layered and labelled
- PDF plan with 0.5 m contours and spot elevations
- Coordinate report in CSV
- Site photos keyed to the plan on request
Topographic surveys: common questions
Does a topographic survey show property lines?
It can show property lines plotted from registered plans, for reference only. The survey itself records the ground, structures and features as they exist on the day.
Can you survey under snow?
Ground surveys are possible in winter, but accuracy drops when the surface is hidden. If design-grade topography is needed, the best time is before snowfall or after melt. We will tell you honestly whether winter conditions suit your scope.
Do you locate buried utilities?
We survey utility marks placed by locators and visible structures such as manholes and valves. If private lines need locating first, we can arrange that as part of the visit.
Related services
Often booked with this

Earthworks, Grading and Volume Surveys
Original ground surveys, slope and grade stakes, cut and fill maps and measured volumes for progress claims and balancing a site.
Read more
Construction Control Surveys and Benchmarks
Horizontal and vertical control placed where your site needs it, tied to the design coordinate system and documented for everyone who builds from it.
Read more
Road, Curb and Subdivision Layout
Centreline, subgrade, curb and gutter, sidewalks and lot grading staked through each stage of a road or subdivision build.
Read moreAvailable across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for topographic surveys
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.