Construction surveying service

As-Built Surveys

What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.

As-built surveys surveys in Alberta

An as-built survey records where things ended up. Owners need it for record drawings, engineers need it to accept the work, and the next trade needs it to know what they are connecting to.

We survey completed work from project control and report it against the design, with deviations shown plainly. Underground work is measured before it is backfilled, and progress as-builts can be scheduled to match your pour and inspection sequence so problems are caught while they are still easy to fix.

Scope

What we survey

  • 01

    Foundations and structures

    Piles, footings, walls, slabs, anchor bolts, columns and floor elevations.

  • 02

    Underground utilities

    Pipe inverts, manholes, valves, bends, services and duct banks, surveyed in the open trench.

  • 03

    Roads and surfaces

    Subgrade, base and finished surfaces, curb and gutter, and drainage structures.

  • 04

    Grading and earthworks

    Finished grades and slopes compared to the design surface, with cut and fill maps.

  • 05

    Industrial facilities

    Pipe racks, pipe supports, equipment pads, tanks and module foundations.

  • 06

    Record drawings

    Survey data supplied in the format your consultant needs to complete the record set.

Underground service pipe stubs set to surveyed locations on a graded building pad
Underground service pipe stubs set to surveyed locations on a graded building pad

Deliverables

What you get back

  • As-built plan in PDF and AutoCAD Civil 3D
  • Design versus as-built table with deviations
  • Coordinate and elevation list in CSV
  • Surface comparison or cut and fill map where grading is involved
Get a quote for as-built surveys

As-built surveys: common questions

When should an as-built survey be done?

As soon as the work is complete and still visible. For buried services that means before backfill. For structures it means before the next trade covers or builds on the work.

Can you produce the record drawings?

We supply the survey data and as-built linework in CAD so your design consultant can complete the record drawings. If you need the as-built plan drafted in full, tell us the standard to follow and we will quote it.

Do you offer independent verification surveys?

Yes. Owners and general contractors often want a check that is independent of the trade that did the layout. We survey from project control and report what we find.

Related services

Often booked with this

Available across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for as-built surveys

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.