Construction surveying service
Construction Control Surveys and Benchmarks
Horizontal and vertical control placed where your site needs it, tied to the design coordinate system and documented for everyone who builds from it.
Control and benchmarks surveys in Alberta
Every measurement on a project comes back to its control. If the control network is weak, or if two contractors are working from different benchmarks, errors show up later as misaligned structures and grades that do not meet.
We establish site control at the start of a project, tie it to the design coordinate system and datum, and place it where it will survive construction. Points are well marked and protected, checked for movement through the job, and issued with a control drawing so every trade and every surveyor on the site works from the same numbers.
Scope
Control survey scope
- 01
Horizontal control
Control points observed with GNSS and total station, adjusted and tied to the project coordinate system.
- 02
Vertical benchmarks
Benchmarks levelled from the published or project datum and placed clear of construction traffic.
- 03
Design tie-in
Checks to existing structures, property information and prior surveys so the design sits where it was intended to.
- 04
Building control
Gridline control and benchmarks transferred into and up the structure.
- 05
Control checks
Periodic re-observation through the project, including after frost, excavation and piling.
- 06
Replacement
Disturbed or destroyed points re-established from the surviving network.

Deliverables
What you get back
- Control points and benchmarks, well marked and protected on site
- Control drawing in PDF and AutoCAD Civil 3D with distances and angles labelled
- Coordinate and elevation list with datum and coordinate system stated
- Record of check measurements and closures
Control and benchmarks: common questions
How many control points does a site need?
Enough that any part of the work can be reached from at least two points with a check to a third. On a single building that may be four to six points and two benchmarks. A plant site or subdivision needs a wider network.
Which coordinate system do you use?
The one the design was drawn in. In Alberta that is commonly 3TM or UTM with a ground scale factor, or a local site grid. We confirm it against the drawings and existing control before anything is set.
Can you check control set by someone else?
Yes. An independent check of existing control before construction starts is inexpensive and catches datum and scale problems before they are built into the project.
Related services
Often booked with this

Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Read more
Pre-Construction Topographic Surveys
Existing conditions surveyed before design or construction: ground, structures, visible utilities and drainage, drawn with clean labelled contours.
Read more
Industrial Plant and Oil Sands Construction Surveys
Pile fields, equipment foundations, pipe racks, module settings and as-builts on plant sites from the Industrial Heartland to Fort McMurray.
Read moreAvailable across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for control and benchmarks
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.