Construction surveying service

Underground Utility and Site Servicing Layout

Line and grade for water, sanitary, storm and shallow utilities, with inverts checked and everything surveyed before the trench is closed.

Utilities and site servicing surveys in Alberta

Pipe that is laid off line or off grade is expensive to dig up. Deep utilities set the levels for everything above them, and a storm line that is a few centimetres high can leave a parking lot holding water for the life of the building.

We stake underground services on offsets the pipe crew can work from, with cut to invert written on each stake. As pipe goes in we check inverts and structures, and we survey the installed work in the open trench so the as-built is a measurement, not an estimate.

Scope

Servicing layout scope

  • 01

    Deep utilities

    Water, sanitary and storm mains with offset stakes showing cut to invert at regular stations.

  • 02

    Structures

    Manholes, catch basins, valves, hydrants and tees set out and checked for rim and invert.

  • 03

    Shallow utilities

    Gas, power, telecom and lighting alignments, duct banks and pedestals.

  • 04

    Building services

    Service connections and under-slab plumbing set to the building grid.

  • 05

    Grade checks

    Invert and pipe slope checks as installation proceeds.

  • 06

    Pre-backfill as-built

    Pipe, fittings and structures surveyed while the trench is open.

Flagged offset stakes and pin flags along the ditch of a rural gravel road
Flagged offset stakes and pin flags along the ditch of a rural gravel road

Deliverables

What you get back

  • Offset stakes marked with station, offset and cut to invert
  • Cut sheets for each run
  • As-built plan and profile data in Civil 3D and PDF
  • Invert and rim elevation table
Get a quote for utilities and site servicing

Utilities and site servicing: common questions

What is a cut sheet?

A table listing each stake by station with its offset, the stake elevation, the design invert and the cut or fill between them. The pipe crew uses it with the stakes to set the trench and pipe to grade.

Can you survey existing buried services before we dig?

We survey what locators have marked and what can be seen at structures. That gives you the existing services on the same drawing as the new work so conflicts show up before excavation.

Do you handle municipal as-built requirements?

We collect as-built data to the standard the municipality or consultant specifies. Send us the requirement with your request and it will be reflected in the quote.

Related services

Often booked with this

Available across Alberta: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for utilities and site servicing

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote