
Construction surveyors · Sherwood Park, Alberta
Construction surveying that keeps Alberta projects on line and on grade
Layout, pile and anchor bolt surveys, site control, as-builts and volumes for general contractors, engineers and industrial owners. Calculated in the office, checked in the field, delivered on your schedule.
- Years of construction survey experience
- 20+Years of construction survey experience
- Commercial projects taken from first stake to as-built
- 200+Commercial projects taken from first stake to as-built
- Crews available on short notice across Alberta
- Next dayCrews available on short notice across Alberta
- Every layout verified in the field and in the office
- 2 checksEvery layout verified in the field and in the office
- Over 20 years on site
- 200+ commercial projects
- Professional liability insurance
- Complete safety program
What we survey
Every stage of the build, from first stake to as-built
One survey team and one set of control from excavation to handover. Pick the scope you need or hand us the whole package.

Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Read more
Pile Layout and Pile As-Built Surveys
Driven, screw, helical and bored piles staked ahead of the rig, then surveyed after installation with deviation and cut-off reports.
Read more
Gridline, Anchor Bolt and Column Layout
Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.
Read more
Construction Control Surveys and Benchmarks
Horizontal and vertical control placed where your site needs it, tied to the design coordinate system and documented for everyone who builds from it.
Read more
As-Built Surveys
What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.
Read more
Earthworks, Grading and Volume Surveys
Original ground surveys, slope and grade stakes, cut and fill maps and measured volumes for progress claims and balancing a site.
Read moreHow a layout job runs
Checked twice before your crew builds from it
A wrong stake costs far more than the survey. Every point we set is calculated, reviewed and then proven in the field before it is handed over.
- A
Drawings in
You send the issued-for-construction set and the schedule. We confirm the coordinate system, datum and control, and raise any conflicts between drawings before a stake goes in.
- B
Calculated and checked
Layout points are calculated in the office from CAD or from the dimensions on the drawings, then reviewed against the design by a second look before the crew leaves.
- C
Staked on site
Robotic total stations and RTK GNSS set the points. Each setup is checked on independent control, and stakes are labelled so a foreman can read them without a phone call.
- D
Verified and reported
Distances between points are measured as a field check, then you get a sketch of what was set. As-builts follow with design and actual positions side by side.
From the field
Real sites. Real stakes in the ground.
Every photo on this site was taken on a job. Pile fields, footings, plant sites and subgrade, in every season Alberta has.








Why contractors call us
A survey crew that works the way a superintendent needs it to
Construction layout has been the centre of this company for more than twenty years, with over 200 commercial projects carried from start to finish. The owner is on the tools, so the person who quotes your job is the person accountable for it on site.
There before the trades
Next-day crews are often available around Edmonton, and we plan staking with your schedule so nobody is standing by.
Stakes anyone can read
Offsets, cuts and grid references are written on every stake, backed by a sketch of what was set.
Problems raised early
Drawing conflicts and dimension errors are flagged before layout, when an RFI is cheap.
Ready for industrial sites
Professional liability insurance and a complete safety program, with documents ready for prequalification.
Who we work for
Built for the projects Alberta builds
Commercial towers, plant sites, subdivisions and haul roads each ask something different of a survey crew.
Commercial and institutional buildings
Offices, retail, schools, warehouses and multi-family buildings, from bulk excavation to the roof.
What we survey 02Industrial, oil sands and energy
Plant sites, pipe racks, module yards, compressor stations and lease pads across northern Alberta.
What we survey 03Civil works, roads and bridges
Road and intersection upgrades, bridge structures, culverts, ponds and municipal infrastructure.
What we survey 04Subdivisions and land development
Residential and industrial subdivisions from clearing and stripping through deep utilities to lot grading.
What we survey 05Earthworks, pits and mine sites
Bulk earthworks, haul roads, stockpiles, borrow pits, tailings structures and mine site construction.
What we survey 06Power, substations and renewables
Substations, transmission structure foundations, wind and solar sites and their access roads.
What we surveyWhat you get back
Reports your engineer can sign off the same week
Field data is reduced in Civil 3D, Trimble Business Center and Leica Infinity and issued in the formats your consultants already use. Every report states the control it was measured from.
- As-built tables showing design and measured position with the deviation in each direction
- Control drawings in PDF and AutoCAD Civil 3D with distances and angles labelled
- Topographic plans with clean, labelled 0.5 m contours and a coordinate report
- Surface to surface volumes with cut and fill colour maps
- CSV and LandXML files in the project coordinate system

Service area
Based in Sherwood Park. On site anywhere in Alberta.
Crews mobilize from Sherwood Park to commercial sites in the cities, plants in the Industrial Heartland and remote work in the oil sands and the north.
- EdmontonAbout 20 minutes from our Sherwood Park base
- Sherwood ParkHome base
- CalgaryAbout 3 hours south of Edmonton
- Fort McMurrayAbout 4.5 hours north of Edmonton
- Grande PrairieAbout 4.5 hours northwest of Edmonton
- Red DeerAbout 1.5 hours south of Edmonton
- Fort Saskatchewan and the Industrial HeartlandAbout 30 minutes northeast of Edmonton
- Leduc and NiskuAbout 30 minutes south of Edmonton
- Cold LakeAbout 3 hours northeast of Edmonton
- LloydminsterAbout 2.5 hours east of Edmonton
- Peace RiverAbout 5 hours northwest of Edmonton
- WhitecourtAbout 2 hours northwest of Edmonton
- Hinton and EdsonAbout 3 hours west of Edmonton
- LethbridgeAbout 5 hours south of Edmonton
- High LevelAbout 8 hours north of Edmonton
Project news
Notes from the field

As-Built Surveys · November 29, 2026
As-Built Surveys Explained: What They Are and When Your Project Needs One
What an as-built survey is, when to schedule one, what the report contains and how it differs from layout. A practical guide for Alberta construction projects.
Read more
Planning a Survey · November 26, 2026
What Construction Surveying Costs in Alberta and How It Is Priced
How construction surveying is priced in Alberta: crew rates, lump sums and unit rates, what drives the cost, and how to avoid paying for return trips.
Read more
Field Practice · November 21, 2026
Winter Construction Surveying in Alberta: What Changes When the Ground Freezes
Frost heave, benchmark checks, cold batteries, marking in snow, short daylight and northern highway travel: how construction surveying changes in winter.
Read moreCommon questions
Construction surveying in Alberta, answered
If yours is not here, call (587) 714-2362. You will get a straight answer from a surveyor.
What does a construction surveyor do?
A construction surveyor takes the design drawings and puts them on the ground. That means setting control, staking gridlines, piles, footings, anchor bolts, utilities, curbs and grades so each trade builds in the right place, then measuring what was built and reporting it back as an as-built survey.
How fast can you get a crew to site?
Next-day service is often available in the Edmonton region, and we mobilize across Alberta on short notice. Call with your location and schedule and we will tell you straight away what is possible.
What do you need from us to price a job?
The site location, the current drawing set (PDF and CAD if you have it), the scope you want staked or measured and your schedule. With that we can usually return a written quote the same day.
How do you make sure layout is right?
Every layout is checked twice. In the office, coordinates are calculated from the drawings and reviewed against the design before the crew leaves. In the field, stakes are checked from independent control and by measured distances between points before we hand them over. Anything that does not close is fixed on the spot.
What drawings and files do you work with?
PDF and CAD drawings, Civil 3D surfaces and alignments, LandXML files and coordinate lists. Deliverables come back as PDF sketches or reports, CSV coordinate files and AutoCAD Civil 3D drawings in the project coordinate system.
Can you work on industrial and oil sands sites?
Yes. We carry professional liability insurance and have a complete safety program in place, with documentation available for prequalification. Crews arrive with the site orientation, PPE and tickets your project requires.
How is construction surveying priced?
Short jobs are usually priced at an hourly or daily crew rate with travel. Larger scopes can be quoted as a lump sum or unit rates per pile, per gridline or per visit. Your quote states what is included so there are no surprises on the invoice.
Quotes
Request a quote
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.