Skip to content
Alberta ConstructionSurveying
Total station working at dusk in the snow outside an industrial plant

Alberta's Industrial Heartland · About 30 minutes northeast of Edmonton

Construction surveying in Fort Saskatchewan and the Industrial Heartland

Construction surveying in Fort Saskatchewan and the Industrial Heartland: pile layout, anchor bolts, plant grid control, as-built surveys and volumes.

Construction surveyors for Fort Saskatchewan and the Industrial Heartland projects

The Industrial Heartland northeast of Edmonton is the province's main concentration of petrochemical, refining and fertilizer plants, spread across Fort Saskatchewan and Strathcona, Sturgeon and Lamont counties. Work there ranges from greenfield plants on pile foundations to small brownfield additions inside operating units, along with the rail yards, storage terminals and pipeline corridors that connect them.

The Heartland is half an hour from our base, so crews go out daily and next-day service is often available. Plant work rewards preparation. We build the layout from the issued drawings, check it against the plant grid and existing as-builts in the office, and confirm site control between monuments before anything is marked for the trades.

Also serving: Redwater, Bruderheim, Lamont, Gibbons, Josephburg, Sherwood Park.

Local work

What we survey around Fort Saskatchewan and the Industrial Heartland

  • 01

    Plant foundations and piles

    Pile layout and as-builts, pile caps, grade beams and equipment foundations for process units, staked from the plant grid and reported against design.

  • 02

    Pipe racks and structural steel

    Anchor bolt and base plate layout and pre-pour checks for pipe rack bents and steel structures, with as-built bolt surveys issued before steel is erected.

  • 03

    Brownfield tie-ins and additions

    As-built surveys of existing foundations, steel and pipe supports inside operating units so new work can be designed and fitted to what is really there.

  • 04

    Terminals, rail and site civil

    Grading, drainage and containment berm layout for tank farms and rail loading areas, with volume surveys and as-builts of finished surfaces and buried utilities.

Services

Most requested in Fort Saskatchewan and the Industrial Heartland

All ten services are available here. These are the ones crews are booked for most often in this region.

All services

Surveying in Fort Saskatchewan and the Industrial Heartland: common questions

What do you need for access to a Heartland plant site?

Tell us early which orientations, tickets and prequalification documents the owner requires. We provide our safety program documents and insurance certificates, and the crew completes the site orientation before the first shift. Permits and gas testing for work inside operating units are arranged through your site supervision.

Do you work in plant grid coordinates?

Yes. Most Heartland plants have their own grid and elevation datum. We work from the owner's published control, check it between monuments before use, and report anything that does not agree. As-builts are delivered in the plant grid so they match the existing drawings.

Can you cover a shutdown or turnaround schedule?

Usually, with notice. Being thirty minutes away lets us put a crew on site for short windows, early starts or consecutive days during an outage. Send the outage dates and scope as early as you can so layout files and checks are finished before the window opens.

Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for a Fort Saskatchewan project

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote