Contact
Book a crew or request a quote
Call, email or send the form below. Tell us where the site is, what needs to be staked or measured and when, and a surveyor will reply the same day.
- Phone
- (587) 714-2362
- Base
- Sherwood Park, serving Edmonton and all of Alberta
Quotes
Request a quote
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.
Before you send it
How fast can you get a crew to site?
Next-day service is often available in the Edmonton region, and we mobilize across Alberta on short notice. Call with your location and schedule and we will tell you straight away what is possible.
What do you need from us to price a job?
The site location, the current drawing set (PDF and CAD if you have it), the scope you want staked or measured and your schedule. With that we can usually return a written quote the same day.
How is construction surveying priced?
Short jobs are usually priced at an hourly or daily crew rate with travel. Larger scopes can be quoted as a lump sum or unit rates per pile, per gridline or per visit. Your quote states what is included so there are no surprises on the invoice.