
Industries
Survey crews for the work Alberta builds
The instruments are the same on every site. What changes is the coordinate system, the tolerance, the paperwork and who needs the report. These are the sectors we work in most.

01
Commercial and institutional buildings
Building projects run on gridlines. Once the primary grid is set and proven, every trade from formwork to curtain wall pulls from it, so the first few visits matter more than any that follow.
We set control clear of the excavation, carry the grid and benchmarks up through the structure, and as-built each stage so the next trade knows what it is starting from.
- Excavation limits, shoring and bulk dig grades
- Piles, footings, grade beams and foundation walls
- Gridlines, columns, cores and slab edges on every level
- Anchor bolts and embeds, checked before and after the pour
- Site servicing, parking, curbs and landscaping
- As-built surveys for the consultant's record set

02
Industrial, oil sands and energy
Industrial construction leaves little room in the numbers. Modules and spools are built off site and must land on foundations surveyed months before, in a plant coordinate system that every contractor on the project shares.
Our crews are used to orientations, permits and working beside operating units. Layout is prepared ahead so that time inside the fence is spent measuring.
- Large pile fields: layout, cut-off and as-built reporting
- Equipment foundations, anchor bolts and base plate elevations
- Pipe rack and pipe support layout and as-builts
- Tie-in point surveys for design and fabrication
- Lease pads, berms, access roads and volumes
- Control networks in plant coordinates

03
Civil works, roads and bridges
Civil work is staked by station and offset and built in lifts, which means the surveyor returns for every stage. Production depends on stakes being there ahead of the grader and the curb machine.
We stake from the Civil 3D corridor or the contract drawings, issue cut sheets with each visit and measure quantities as the work proceeds.
- Centreline, slope stakes and subgrade
- Curb and gutter, sidewalks and medians
- Bridge abutments, piers, bearings and deck grades
- Storm, sanitary and water mains with structures
- Stormwater ponds, ditches and culverts
- Progress and final quantity surveys

04
Subdivisions and land development
A subdivision is a long sequence of small layouts: stripping limits, deep utilities, roads, shallow utilities, curb, lot grading. It goes smoothly when one crew holds the control and the history from start to finish.
We work from the engineer's design and coordinate staking with operators and foremen so stakes are set the way each crew wants to use them.
- Clearing, stripping and grading limits
- Deep and shallow utility layout
- Road, lane and curb staking
- Lot grading and building pocket grades
- Stormwater management facilities
- As-built data for municipal acceptance

05
Earthworks, pits and mine sites
On an earthworks job the survey is the measure of payment. Original ground, design surfaces and progress surveys have to be defensible, because every cubic metre is counted from them.
We survey by GNSS, total station or drone depending on the area and the surface, and state the method and the surfaces used in every volume report.
- Original ground and pre-strip surveys
- Slope stakes, cut and fill stakes and grade checks
- Design surfaces for machine control
- Monthly progress and stockpile volumes
- Haul road, berm and dyke layout
- Final surface as-builts with cut and fill maps

06
Power, substations and renewables
Power projects spread a great many small foundations across a large area. Each one needs to be found, staked and as-built without burning the day on travel between them.
We plan control and access before mobilizing so structure locations can be staked efficiently, and report foundation and anchor bolt as-builts in the form the owner's engineer asks for.
- Structure and foundation locations
- Pile and anchor bolt layout and as-builts
- Substation pads, ground grid and equipment foundations
- Access roads, crane pads and laydown areas
- Pre-construction topography of large sites
- Control across long corridors and wide sites

Book a crew
Working in a sector not listed here?
If it is being built and needs to be in the right place, we can survey it. Call and describe the job.
Quotes
Request a quote
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.