Skip to content
Alberta ConstructionSurveying
Total station set up in deep snow beside steel pipe racks at an industrial facility

Wood Buffalo and the Athabasca oil sands · About 4.5 hours north of Edmonton

Construction surveying in Fort McMurray

Construction surveying in Fort McMurray and the oil sands: pile layout and pile as-builts, anchor bolts, plant grid control, pad grading and volume surveys.

Construction surveyors for Fort McMurray projects

Construction around Fort McMurray is dominated by the Athabasca oil sands: mining and extraction plants north of town along Highway 63, in-situ facilities to the south toward Anzac and Conklin, and the camps, tank farms, pipe racks and roads that support them. Much of it sits on pile foundations, so pile layout and pile as-builts make up a large share of the survey work.

A lot of that work happens in winter, when muskeg is frozen and equipment can reach ground that is soft the rest of the year. We mobilize from the Edmonton area and stay for the length of the scope, working the site's shift rotation. Our safety program documents and insurance certificates are available for prequalification before the crew is booked.

Also serving: Fort McKay, Anzac, Gregoire Lake Estates, Saprae Creek, Conklin, Janvier.

Local work

What we survey around Fort McMurray

  • 01

    Pile fields

    Driven and screw pile centres staked in blocks ahead of the rigs, then each pile surveyed after installation with deviation and cut-off elevation reports for the engineer.

  • 02

    Process modules and pipe racks

    Foundation, anchor bolt and base plate layout for modules, pipe racks and equipment, checked before grout so modules built elsewhere land on their supports.

  • 03

    Camps and support buildings

    Pad grading stakes, pile or footing layout and utility line and grade for camps, shops, warehouses and offices, with as-builts of buried services before backfill.

  • 04

    Earthworks and site pads

    Topographic surveys before stripping, grade stakes for pads, roads and ditches, and volume calculations for cut, fill and stockpiles at progress milestones.

Services

Most requested in Fort McMurray

All ten services are available here. These are the ones crews are booked for most often in this region.

All services

Surveying in Fort McMurray: common questions

How do you mobilize a crew to Fort McMurray and the oil sands sites?

The crew drives up from Edmonton with the instruments and stays in town or in camp for the length of the scope. We need lead time for site orientations and access badging, so tell us the site requirements when you ask for a quote.

Can you survey through a Fort McMurray winter?

Yes. Much of the piling and earthwork up here is scheduled for frozen ground. Cold shortens battery life and slows everything down, so we plan setups carefully and keep spare batteries warm. Control set on frozen ground is rechecked through spring thaw, because frost heave moves shallow marks.

What coordinate system do oil sands sites use?

Most plants have their own plant grid and elevation datum, defined by the owner. We work in the plant grid from the site's published control, check between monuments before layout, and deliver as-builts in the same system so they match the owner's drawings.

Other centres: Edmonton, Sherwood Park, Calgary, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for a Fort McMurray project

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote