Leduc County and the airport area · About 30 minutes south of Edmonton
Construction surveying in Leduc and Nisku
Construction surveying in Leduc and Nisku: warehouse and shop layout, piles, anchor bolts, yard grading, lot servicing, as-built surveys and volumes.
Construction surveyors for Leduc and Nisku projects
Nisku and Leduc form a large industrial area built around oilfield manufacturing, fabrication and module yards, and equipment shops. In recent years the land around Edmonton International Airport and along Highway 2 has filled in with distribution warehouses and cargo buildings, most of them tilt-up or steel structures on big, flat, heavily graded sites.
This area is a short drive from our base, so crews come out daily and next-day service is often available. Typical calls are pile and footing layout for a new shop, anchor bolts for a pre-engineered building, grading stakes for a yard, or an as-built of a finished slab or pond. Each layout is checked in the office first, then on site.
Also serving: Beaumont, Devon, Calmar, Millet, Wetaskiwin, Thorsby, Edmonton International Airport.
Local work
What we survey around Leduc and Nisku
- 01
Distribution warehouses
Footing, column grid and slab edge layout for large-footprint buildings, dock and door locations, and as-builts of slabs, paving and stormwater ponds.
- 02
Fabrication shops and module yards
Pile and foundation layout for shops and crane runways, plus grading stakes and as-built surveys for heavy-duty gravel yards and laydown areas.
- 03
Pre-engineered steel buildings
Anchor bolt layout and pre-pour checks against the building supplier's drawings, with an as-built bolt report before steel is delivered to site.
- 04
Lot servicing and grading
Line and grade for water, sanitary and storm services, ditches, culverts and approaches on industrial lots, with volumes for imported or exported material.
Services
Most requested in Leduc and Nisku
All ten services are available here. These are the ones crews are booked for most often in this region.

Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Read more
Gridline, Anchor Bolt and Column Layout
Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.
Read more
Earthworks, Grading and Volume Surveys
Original ground surveys, slope and grade stakes, cut and fill maps and measured volumes for progress claims and balancing a site.
Read more
Underground Utility and Site Servicing Layout
Line and grade for water, sanitary, storm and shallow utilities, with inverts checked and everything surveyed before the trench is closed.
Read moreSurveying in Leduc and Nisku: common questions
Can you get to Nisku on a day's notice?
Often, yes. Nisku and Leduc are about half an hour from our base and are treated the same as Edmonton for scheduling. Send the drawings when you call so the layout can be calculated and checked that afternoon and the crew can start first thing in the morning.
Why survey anchor bolts before the pour on a steel building?
Pre-engineered buildings arrive with base plates already drilled, so bolts that are out of position mean field modifications and delay. We check templates before the pour and survey the bolts after, then send a report comparing each bolt group to the supplier's drawing.
Do you handle lot grading as-builts for industrial sites?
Yes. We survey finished grades, swales, ponds and building elevations and deliver a drawing and point file your engineer can use for the lot grading submission. If the municipality requires an Alberta Land Surveyor's certificate, that part must come from a land surveyor.
Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for a Leduc and Nisku project
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.