
Strathcona County and east Edmonton · Home base
Construction surveying in Sherwood Park
Construction surveyors based in Sherwood Park: building layout, pile and gridline staking, site control, as-built surveys and volumes across Strathcona County.
Construction surveyors for Sherwood Park projects
Sherwood Park is where we are based. From here the east Edmonton industrial areas, the Yellowhead and Anthony Henday corridors and the plants along Highway 21 toward Fort Saskatchewan are all a short drive, which is why short-notice layout is usually possible.
Local work is a mix of commercial and light industrial buildings, shops and yards in the business parks, new residential areas and the county roads and servicing that go with them. We are often on site the next morning, and a single visit for a set of footings or an anchor bolt check is routine.
Also serving: Ardrossan, Fort Saskatchewan, Edmonton, Beaumont, Tofield, Lamont, Josephburg.
Local work
What we survey around Sherwood Park
- 01
Commercial and light industrial buildings
Gridlines, footings, piles, anchor bolts and slab elevations for shops, warehouses and offices in the business parks, with as-builts issued ahead of steel.
- 02
Industrial yards and laydown areas
Topographic surveys before design, then grade stakes, drainage and gravel pad layout, with volumes measured for payment as the work is placed.
- 03
Residential and commercial development
Line and grade for deep and shallow utilities, curb and gutter, roads and lot grading, staked ahead of each crew as the phases open.
- 04
Plant and facility work nearby
Pile fields, equipment foundations and pipe support as-builts for the refineries and processing plants east and northeast of the hamlet.
Services
Most requested in Sherwood Park
All ten services are available here. These are the ones crews are booked for most often in this region.

Construction Layout and Staking
Building corners, gridlines, footings, walls, slabs and grades staked from your drawings and checked before they are handed to the trades.
Read more
Gridline, Anchor Bolt and Column Layout
Gridlines carried up through the structure, anchor bolt templates set and checked before the pour, and as-builts issued before steel arrives.
Read more
Underground Utility and Site Servicing Layout
Line and grade for water, sanitary, storm and shallow utilities, with inverts checked and everything surveyed before the trench is closed.
Read more
As-Built Surveys
What was actually built, measured and compared against design: foundations, structures, utilities, roads and finished grades.
Read moreSurveying in Sherwood Park: common questions
How quickly can a crew reach a Sherwood Park site?
Usually the next working day, and sometimes the same day for a short visit. Sherwood Park is our base, so there is no travel time to price in and a return visit for an as-built is easy to fit around your pour schedule.
Do you work on the industrial sites along Highway 21 and Highway 16?
Yes. Much of our work is on plant and yard sites east and northeast of Sherwood Park. Send the site orientation and prequalification requirements with your request and the crew will arrive with them complete.
Can we meet on site before the job starts?
Yes. For a project close to home a short site walk with your superintendent is the quickest way to agree on control, offsets and the staking sequence before the first layout visit.
Other centres: Edmonton, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Peace River, Whitecourt, Hinton and Edson, Lethbridge, High Level.
Quotes
Quote for a Sherwood Park project
Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.
- 1Send the requestSite location, scope and schedule. Drawings can follow by email.
- 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
- 3Crew on siteLayout calculated and checked before the crew arrives.