Skip to content
Alberta ConstructionSurveying
Total station and data collector set up beside a road under a concrete bridge

Peace River valley and northwestern Alberta · About 5 hours northwest of Edmonton

Construction surveying in Peace River

Construction surveying in Peace River: bridge and pile layout, valley control networks, heavy oil facility foundations, as-built surveys and stockpile volumes.

Construction surveyors for Peace River projects

The town of Peace River sits deep in the valley near where the Smoky and Heart rivers meet the Peace, and the terrain shapes the work. Bridges, steep highway grades, slope repairs and river bank protection are regular civil projects. East of town the Peace River oil sands support thermal and cold-flow heavy oil facilities, and forestry supplies a pulp mill and sawmills in the region.

Peace River is about five hours from Edmonton, so we plan trips around complete scopes and stay in town while the work is done. Valley sites often have poor sky view for GNSS and long sight lines across water, so we plan control carefully and rely on total stations where satellite positions are not dependable.

Also serving: Grimshaw, Fairview, Manning, Nampa, Falher, St. Isidore, Berwyn.

Local work

What we survey around Peace River

  • 01

    Bridges and river crossings

    Control on both banks, pile and pier layout, abutment and bearing seat elevations, girder seat as-builts and deck grades through each stage of construction.

  • 02

    Highway and slope work

    Cut and fill stakes on valley grades, culvert and drainage layout, and as-built surveys of slide repairs and retaining structures to confirm the built geometry.

  • 03

    Heavy oil facilities

    Pad grading, pile layout and equipment foundations for well pads, batteries and plants east of town, with pile as-builts and deliverables in the plant grid.

  • 04

    Mill and industrial sites

    Foundation and anchor bolt layout for equipment and buildings at forestry and industrial sites, and stockpile volume surveys of chip piles, aggregate and fill.

Services

Most requested in Peace River

All ten services are available here. These are the ones crews are booked for most often in this region.

All services

Surveying in Peace River: common questions

How do you handle control in the river valley?

We set a network of control points on stable ground on both sides of the work, measure between them with the total station, and tie them to GNSS observations taken where the sky is open. Points are checked on every visit because valley slopes do move.

How much notice do you need for a trip to Peace River?

A week is comfortable and a few days is often workable. The drive is about five hours each way, so the crew travels the day before and starts fresh. Grouping layout, as-builts and volume surveys into one trip keeps travel from dominating the cost.

Do you do bridge layout and as-builts?

Yes. Bridge work is checked more than most layout because piers, abutments and girders are fabricated to fit. We confirm span lengths between substructure units by direct measurement, record bearing seat elevations before girders arrive, and report the as-built figures to the engineer.

Other centres: Edmonton, Sherwood Park, Calgary, Fort McMurray, Grande Prairie, Red Deer, Fort Saskatchewan and the Industrial Heartland, Leduc and Nisku, Cold Lake, Lloydminster, Whitecourt, Hinton and Edson, Lethbridge, High Level.

Quotes

Quote for a Peace River project

Tell us where the site is, what needs to be staked or measured and when. We reply the same day with a written quote, and a copy of your request is emailed to you straight away.

  1. 1Send the requestSite location, scope and schedule. Drawings can follow by email.
  2. 2Get a written quoteCrew rate or lump sum, with what is included stated plainly.
  3. 3Crew on siteLayout calculated and checked before the crew arrives.
What do you need surveyed?

Urgent? Call (587) 714-2362

Drawings can be attached by replying to the confirmation email you receive.

CallRequest a quote