Skip to content
Alberta ConstructionSurveying

Regions · September 14, 2024 · 3 min read

Construction Surveying Across Northern Alberta: What We Do and Where We Work

An overview of Alberta Construction Surveying: layout, as-built, control and volume surveys from Edmonton to Fort McMurray, Grande Prairie and High Level.

Total station set up for layout beside formwork on a building site in early winter

Key points

  • We are a construction-only survey company based in Sherwood Park, working across Alberta.
  • Services cover layout, control, as-built, topographic and volume surveys for contractors.
  • Every layout is checked in the office and again in the field before it is handed over.

Alberta Construction Surveying is a construction-only survey company based in Sherwood Park. We set out and measure work for contractors across Alberta, with regular travel to Fort McMurray, Grande Prairie, Lloydminster, Peace River, Slave Lake, Cold Lake, Athabasca, High Level, Bonnyville and Whitecourt.

The company is owner operated and has over 20 years of construction survey experience behind it. This article is a plain summary of what we do, where we go, and what you can expect when you book a crew.

What services does Alberta Construction Surveying provide?

  • Construction layout: excavation limits, footings, foundation walls, gridlines, columns, slabs and site works staked from your drawings.
  • Pile layout and pile as-builts for driven, screw, helical and bored piles.
  • Gridlines and anchor bolts, checked before the pour and surveyed again before steel arrives.
  • Site control and benchmarks, tied to the design coordinate system and documented.
  • As-built surveys of foundations, structures, underground utilities, roads and grading.
  • Earthworks: original ground, grade stakes, cut and fill maps, stockpile and progress volumes.
  • Pre-construction topographic surveys with contours and spot elevations.
  • Underground utility, road, curb and subdivision layout.
Total station display showing stakeout values beside a concrete foundation under construction
A total station set up for layout beside a foundation under construction.

Which Alberta communities do we serve?

CommunityTypical construction survey work
EdmontonCommercial, institutional and multi-family buildings, site servicing, and plant work in the Industrial Heartland to the northeast.
Fort McMurrayOil sands facilities, pile fields, module foundations, and commercial and municipal work in town.
Grande PrairieGas plants, compressor stations, well pads, and commercial and subdivision work.
LloydminsterHeavy oil facilities, commercial buildings and site servicing on the Alberta side of the border city.
Peace RiverEnergy facilities, bridges and roads, and municipal projects.
Slave LakeForestry and energy facilities, commercial buildings and municipal servicing.
Cold LakeIn situ oil sands facilities, commercial buildings and municipal work.
AthabascaRoads, municipal servicing, and commercial and institutional buildings.
High LevelForestry and energy facilities and municipal projects in the far northwest.
BonnyvilleHeavy oil facilities, commercial buildings and site servicing.
WhitecourtForestry and gas facilities, commercial buildings and road work.

These are the places we are asked about most often. The service area is the whole province, and the smaller communities and work sites between these towns are covered the same way. Location pages for Edmonton, Fort McMurray, Grande Prairie, Cold Lake and Peace River have more detail.

What equipment and software do we use?

Field crews carry robotic total stations, RTK GNSS and digital levels. The total station is used where millimetres matter, such as gridlines, anchor bolts and pile as-builts. RTK GNSS, typically good to a couple of centimetres, is used for earthworks, roads and open sites. Digital levels carry benchmarks and check elevations. In the office, calculations and drawings are done in Civil 3D, Trimble Business Center and Leica Infinity, so we can work from the CAD and surface files your consultants issue and return files they can open.

How is the work checked?

Every layout is checked twice. In the office, layout points are calculated from the issued-for-construction drawings and reviewed against the design before the crew leaves. In the field, the crew checks into known control at each setup and measures between the points it has set before handing them over. If dimensions on the drawings do not close, or two drawings disagree, you hear about it before stakes go in the ground.

GNSS receiver over a control point surrounded by guard stakes on a gravel pad
A GNSS receiver set over a control point protected by guard stakes.

How do you book a crew?

Send the site location, the current drawing set in PDF and CAD if you have it, the scope you want staked or measured, and your schedule. Next-day crews are often available in the Edmonton region. For sites farther north, a few days of notice lets us prepare calculations and complete any site orientation before travelling. We carry professional liability insurance and have a complete safety program, with documents available for prequalification.

Call (587) 714-2362 to talk through a job, or fill in the quote form and attach your drawings.

Updated November 29, 2026

Book a crew

Need a crew on site?

Send the drawings and your schedule. You will have a written quote back the same day in most cases.

CallRequest a quote